Rosewood Little Dix Bay
2021 | Villa Joy Data Network
Coakley Bay Plantation
2021 | Custom Shades
Blunder Bay
2021 | Lighting Control in Managers House
Bitter End Yacht Club
2021 | Data Network Upgrade
Oil Nut Bay Resort
2020 | Replace Fibre to Cliff Suites
Necker Island
2020 | Fibre from Bali Hi to GH
Oil Nut Bay Resort
2020 | Marina Villa Cove Lighting
The Moorings
2020 | Crewed Lounge and Briefing Room Network
Necker Island
2020 | Add Bridge to Lutron Zone
Necker Island
2020 | Fibre from NBE to GH
Necker Island
2020 | Fibre Temple to Bali Lo
Pavilion, ONB
2020 | AV Systems
Cliff Suites, ONB
2020 | Replace Fibre
Marina Villas, ONB
2020 | Cove Lighting
Rosewood Little Dix Bay
2020 | Low Voltage Systems
Exclusive Villas
2020 | Conduit Repairs + Additions
Necker Beach Estate
2020 | AV Racks
Necker Island
2020 | Rack Supply
Necker Beach Estate
2020 | Master Drapes
Rosewood Little Dix Bay
2020 | Fibre Network
Necker Island
2020 | Elders Temple Data
Necker Beach Estate
2020 | Master Drapes
Necker Island
2020 | Lutron Systems
Necker Beach Estate
2020 | NBE Data
Bitter End Yacht Club
2020 | Low Voltage Systems Design
The Moorings
2019 | LMS Training Area
Necker Island
2019 | Staff Racks and UPS
Pavilion, ONB
2019 | Lighting Control
Necker Island
2019 | Temple Drapes
Bitter End Yacht Club
2019 | Construction + Container WIFI
Rosewood Little Dix Bay
2019 | Resort-wide Fibre Network
Necker Island
2019 | Fibre Install
Necker Island
2019 | Temple Bedrooms Lutron
Moskito Island
2019 | BE Replace Fibre
Necker Island
2019 | Elder’s Temple Data
The Moorings
2019 | Data Systems
Necker Island
2019 | Temple Lutron Design
Brandywine Bay Restaurant
2019 | Audio Upgrade
Necker Island
2019 | Additional Access Points
Moskito Island
2019 | Fibre to Fuel Dock
Necker Island
2019 | Temple Data
Exclusive Villas
2019 | Conduit Repair + Install
Nail Bay Sports Club
2019 | AV Systems
Necker Island
2019 | Staff Area WIFI
Rosewood Little Dix Bay
2019 | Admin Firewall
Necker Island
2019 | Watersports Rack
The Moorings
2018 | Crewed Yachts Office Data
Necker Island
2018 | Fibre Links
The Moorings
2018 | Hotel 1 + 2 Data
Necker Island
2018 | Dish over Fibre
Necker Island
2018 | Beach House Fibre
The Moorings
2018 | Admin Office Data
Necker Island
2018 | Ruckus Upgrade
The Moorings
2018 | Hotel 3
Tortola Sports Club
2018 | AV Upgrade
Moskito Island
2018 | Conduit + Cable Repair
Cooper Island Beach Club
2018 | Fibre Link to Solar
Rosewood Little Dix Bay
2018 | Office Wifi Cabling + Conduit
Moskito Island
2018 | Load Shedding Fibre
Bitter End Yacht Club
2018 | Wifi for Construction
The Moorings
2018 | Finance Office Data
Rosewood Little Dix Bay
2018 | Construction Wifi
Tingalayo Villa
2018 | Post-Irma Rebuild
Necker Island
2018 | Penthouse RTI Control
Tortola Sports Club
2018 | Security Upgrade
Guana Island
2018 | H2O System Fibre Link
The Moorings
2017 | Post Irma AV Repair
The Moorings
2017 | Phase 1 Network Repair
Village Cay
2017 | DirecTV Installation
Necker Island
2017 | PlaySight Cable + Conduit
Rosewood Little Dix Bay
2017 | F+B Data
Necker Island
2017 | Temple Upgrade
Rosewood Little Dix Bay
2017 | Low Voltage Systems
Necker Island
2017 | Speakers for Pavilion
Moskito Island
2017 | TV Lift
Tingalayo Villa
2017 | Systems Upgrade
Necker Beach Estate
2017 | Cabling for Security Cameras
Bitter End Yacht Club
2017 | Camera System
Moskito Island
2017 | iPads + iPorts